RU  UZ 
/ Our technology

Our technology

Scalable computing power

In data processing projects we often encounter procedures (for instance, migration transformations), which demand significant computing power or long time for running. We have worked out standardized procedures for software installation and utilization, which allow for engaging almost unlimited computing power on a very short time frame. This gives us the opportunity to drastically shorten projects duration, and as well to simplify procedure of iterative image improvements. Also, almost full set of software we use, except the ones that are technically designed in a different way, is capable of scaling the computing power.

Using specialized algorithms for image improving

Universal software for seismic data processing and interpretation, as a rule, comprises mainly basic algorithms, not always appropriate for solving the specific geological task in special conditions. When executing data processing and interpretation in our projects we apply either self-developed or third-party software algorithms, allowing to obtained improved results (as compared to standard solutions) in specific geological conditions (with Multifocusing, or FWI etc). 

Automating work process

We have built a constant improvement system into our working process. Maintenance by company’s software developers allows us to minimize human labour efforts and concentrate experts’ attention on quality control and project timeline.